PROJECT - NW1 - CAMDEN
COMPANY
Cameron Black, Hampstead, North, London NW1 www.cameronblack.com
WORKING WITH
Emily Burke @ Acrylicize www.acrylicize.com - Shoreditch, East London, E2
REQUEST
English Oak, English Elm, American Black Walnut, European Walnut and Reclaimed Columbian Pine
VIEW PROJECT
X
PROJECT - NW1 - CAMDEN
The project
A very unique project installing various timbers including, English Oak, English Elm, American Black Walnut, European Walnut and Reclaimed Columbian Pine fully adhered using Uzin MK95 adhesive to the two central staircases at ASOS HQ. Acrylicize applied the graphics to all the stair treads prior to installation. Two stainless steel inserts were routed to the leading edge of each of the treads. Bona Traffic was applied to each tread once installed. The steps within each of the lobby areas were clad using the reclaimed Columbian Pine. After sanding, Bona create was applied followed by further coats of Bona Traffic.
REQUEST
English Oak, English Elm, American Black Walnut, European Walnut and Reclaimed Columbian Pine
PROJECT TYPE
COMMERCIAL
PROJECT– SE1 – SOUTHWARK
COMPANY
Martha Burrows - Morey Smith Ltd www.moreysmith.com - Southwark, South London SE1
REQUEST
Various Timbers - American Black Walnut, English Elm & Oak, Reclaimed Columbian Pine, and European Fumed Oak
VIEW PROJECT
X
PROJECT – SE1 – SOUTHWARK
The project
Part of our project brief was to supply and install stair treads to two staircases, including floor installation to the surrounding landing and reception steps. We used various timbers such as American Black Walnut, English Elm & Oak, Reclaimed Columbian Pine, and European Fumed Oak. Once installed, we finished the installation with three applications of Bona traffic commercial lacquer.
REQUEST
Various Timbers - American Black Walnut, English Elm & Oak, Reclaimed Columbian Pine, and European Fumed Oak
PROJECT TYPE
COMMERCIAL
PROJECT– W8 - KENSINGTON
CUSTOMER
Deborah - Kensington, West London W8
REQUEST
Parquet Rustic Oak - Herringbone
VIEW PROJECT
X
PROJECT– W8 - KENSINGTON
The project
Parquet project using Unfinished European Rustic Oak blockfully adhered in a Herringbone fashion, without a border. We then sanded and finished with Osmo Walnut Oil followed by a final coat of Osmo clear hard wax oil.The sub floor was constructed using Monarfloor tri deck boards, laid directly to the existing joists/batten providing an acoustic sub floor.
REQUEST
Parquet Rustic Oak - Herringbone
PROJECT TYPE
DOMESTIC
PROJECT– CO5 - COLCHESTER
CUSTOMER
Michelle Papa @ FTSS UK www.ftssuk.com - Colchester, Essex CO5
REQUEST
Unfinished Prime Oak with Prime Grade European Border
VIEW PROJECT
X
PROJECT– CO5 - COLCHESTER
The project
Our work was to prepare the sub floor using Uzin PE460 liquid dpm. Uzin NC 150 levelling compound was applied to achieve a level surface and the correct floor level. We then laid unfinished Prime Oak blocks, fully adhered in a dice pattern with a Prime Grade European single plank border. The floor was finished with Osmo hard wax oil.
REQUEST
Unfinished Prime Oak with Prime Grade European Border
PROJECT TYPE
COMMERCIAL
PROJECT– IG8 - WOODFORD
CUSTOMER
Jon - Woodford, Greater London IG8
REQUEST
Nature Grade Engineered Oak
VIEW PROJECT
X
PROJECT– IG8 - WOODFORD
The project
Jon requested us to lay Engineered, European - Oiled Oak, 160mm, Nature Grade. This was nailed to the existing sub floor. The skirting was trimmed allowing the new floor to be fitted and look fantastic
REQUEST
Nature Grade Engineered Oak
PROJECT TYPE
DOMESTIC
PROJECT– E10 - HACKNEY
CUSTOMER
Natalie - Wanstead, Greater London E10
REQUEST
Engineered Oak / Technics 5 Acoustic Underlay
VIEW PROJECT
X
PROJECT– E10 - HACKNEY
The project
Natalie requested an Engineered Oak floor, oiled, 190mm, prime grade, random length, laid as a floating floor onto Technics 5 acoustic underlay.
REQUEST
Engineered Oak / Technics 5 Acoustic Underlay
PROJECT TYPE
DOMESTIC
PROJECT– N8 - HORNSEY
CUSTOMER
Christine - Hornsey, North London N8
REQUEST
Repair, Sand and Finish
VIEW PROJECT
X
PROJECT– N8 - HORNSEY
The project
The existing floor had an extreme amount of vertical movement. We first had to repair the sleeper wall under the floor and reclaimed pine boards were used to repair damaged floorboards. After our work was to fully sand the floor and prime with Junkers prelak primer followed by two further coats of Junkers strong lacquer.
REQUEST
Repair, Sand and Finish
PROJECT TYPE
DOMESTIC
PROJECT– NW3 – PRIMROSE HILL
CUSTOMER
Peter - Primrose Hill, North London, NW3
REQUEST
Sanding using Osmo Wax Oil finish
VIEW PROJECT
X
PROJECT– NW3 – PRIMROSE HILL
The project
We sanded the existing Weitzer Parkett WP strip floor to remove the problematic finish. Re-finished using Osmo hard wax oil.
REQUEST
Sanding using Osmo Wax Oil finish
PROJECT TYPE
DOMESTIC
PROJECT– E8 - HACKNEY
CUSTOMER
Chris - Hackney, East London E8
REQUEST
Smoked European Oak
VIEW PROJECT
X
PROJECT– E8 - HACKNEY
The project
After a full survey and advising Chris of our products, he requested us to install random width, Engineered European Oak, 30 day smoked, Osmo hard wax oil finish. This was laid as a floating floor onto Technics 5 acoustic underlay.
REQUEST
Smoked European Oak
PROJECT TYPE
DOMESTIC
PROJECT– RM14 - UPMINSTER
CUSTOMER
Tina and Clive - Upminster, Greater London
REQUEST
Rustic Grade Herringbone
VIEW PROJECT
X
PROJECT– RM14 - UPMINSTER
The project
Unfinished European, rustic grade block, fully adhered in a herringbone fashion, without borders, using Bona R850 adhesive. The sub floor was prepared using Bona R580 liquid DPM. After installation wesanded and finished using Osmo Antique Oak colour followed by Osmo clear hard wax oil.
REQUEST
Rustic Grade Herringbone
PROJECT TYPE
DOMESTIC
PROJECT– NW3 – PRIMROSE HILL
CUSTOMER
Jeremy and Sandra - Primrose Hill, North London NW3
REQUEST
Engineered European Oak
VIEW PROJECT
X
PROJECT– NW3 – PRIMROSE HILL
The project
We installed an unfinished Engineered European Oak(quarter sawn), secret nailed to a prepared sub floor. Uzin PE460 liquid DPM was applied to the basement area because high moisture readings were taken from the sub floor. Then 18mm WPB ply was then fully adhered, using Uzin MK77 adhesive. The floor was sanded, primed using Junkers base followed by two further coats of Junkers H.P. commercial floor lacquer.
REQUEST
Engineered European Oak
PROJECT TYPE
DOMESTIC